09/11/07 Bamboo screening fixed across pergolas

09/11/07 Pools Tiled

09/11/07 Garden and recreational area walling being completed

09/11/07 Distributing and levelling top soil

09/11/07 Pavements being laid

09/11/07 Boundary fencing in place

17/07/07 Top coat of external paint going on D blocks

17/07/07 Pergolas going on C Blocks

17/07/07 Areas around C2, C3, C4 levelled with top soil and curbs put in

14/06/07 Top coat of exterior paint going on C blocks

05/06/07 Front doors put on D block

05/06/07 External paint work being carried out on units

29/05/07 Outside lighting connected to C blocks

28/05/07 pergolas being added to C4 block

22/05/07 windows going into A4 and A3

17/05/07 A7 floor tiles laid

15/05/07 B4 floor tiles laid

07/05/07 2nd layer concrete in all pools

02/05/07 D block pool filled for testing

24/04/07 bathroom fixtures and fittings well under way

19/04/07 tiling and kitchens in final stages in all C blocks

17/04/07 C blocks garden areas filled in and levelled

13/04/07 steps in place up to C4 penthouse roof

10/04/07 solar panels and water tanks on most B, C and D blocks

05/04/07 Concrete being laid for swimming pools

29/03/07 windows go into D blocks

26/03/07 tiling nearing completion on all blocks

20/03/07 exterior paint covers most blocks

15/03/07 show house path laid

13/03/07 first paint coat on C blocks

12/03/07 tiling completed in A1 and A2

08/03/07 More facia stonework added to units

05/03/07 Roads dug out through complex

02/03/07 kitchen units going into C blocks

01/03/07 Facia stone work added to B1

21/02/07 Gymnasium well under way